Alamance Regional Medical Center
Alamance Regional Health Services
Burlington, North Carolina
TMG provided construction phase project control services for the new 230 bed, 360,000 square foot full-service medical center. Constructed on an 80 acre site near Elon College, NC, the steel frame main building incorporates a cruciform plan with twin 4-story bed towers, a medical mall, ancillary support spaces, and detached Energy building. The fast-track, multiple bid package project was administered by a managing contractor. The project was completed in June of 1995.
Avent Ferry Complex Residence Hall Renovations
North Carolina State University
Raleigh, North Carolina
Belle Meade Retirement Community
St. Joseph’s of the Pines
Southern Pines, North Carolina
Cardiovascular Laboratory Addition
New Hanover Regional Medical Center
Wilmington, North Carolina
Clinical Services Building Addition
NorthEast Medical Center
Concord, North Carolina
Cypress Glen Retirement Center
United Methodist Retirement Homes
Greenville, North Carolina
Deerfield Episcopal Retirement Community
Deerfield Episcopal Retirement Community
Asheville, North Carolina
Duke Ambulatory Care Clinics & Engineering Systems Renewal
Duke University Medical Center
Durham, North Carolina
This 4-year multi-phased project consists of 173,000 square feet of new space and 195,000 square feet of renovation work in the Duke Hospital South complex. Phase 1 includes a new 3-level cast-in-place concrete, stone-clad Reception Building on the north side of Duke Hospital South with an air-conditioned pedestrian bridge to the existing PG1R parking garage. A new 4-level cast-in-place infill structure on the south side of Duke Hospital South overlooks the Sarah P. Duke Gardens, as does the new 1-story steel addition atop the East Infill building. Phase 2 consists of a new 3-level cast-in-place concrete, stone-clad Connector Building and significant internal renovations in the Duke Hospital South complex. Phases 3 and 4 complete the renovations in the Duke Hospital South complex. A related project called the Engineering Systems Renewal Project adds (4) new air handlers to serve the new and renovated spaces, 32 new mechanical shafts and electrical risers in Duke Hospital South and mechanical and electrical upgrades in numerous existing mechanical rooms. TMG provided construction phase project control services and personnel relocation planning services on a departmental basis. The project began in October 1996 and was completed on schedule in the fall of 2000.
Duke Center for Living Medical Office Building
Duke University Medical Center
Durham, North Carolina
Duke South Hospital Renovations
Duke University Medical Center
Durham, North Carolina
Existing Facility Fire Alarm & Sprinkler Renovations
UNC Hospitals
Chapel Hill, North Carolina
Heart Center
Wake Medical Center
Raleigh, North Carolina
Joyner Library Additions & Renovations
East Carolina University
Greenville, North Carolina
Kenan Flagler School of Business Parking Deck
University of North Carolina
Chapel Hill, North Carolina
Martin Marietta Office Building
Martin Marietta
Raleigh, North Carolina
Medical Education Institute / Clinic
Wake Medical Center
Raleigh, North Carolina
Medical Office Building (Southwest Satellite Facility)
Duke University Medical Center
Durham, North Carolina
Moore Regional Hospital
Moore Regional Hospital
Pinehurst, North Carolina
Moses Cone East Wing Addition & Renovations
Moses Cone Memorial Hospital
Greensboro, North Carolina
North Carolina Neurosciences Hospital
UNC Hospitals
Chapel Hill, North Carolina
The Milestone Group (TMG) provided CPM scheduling services for the new research hospital. The building is a ten story, 250,000 square foot cast-in-place concrete structure with exterior skin of precast concrete and aluminum curtainwall. The seventh floor of the hospital is given exclusively to faculty laboratories. The project was contracted to multiple Prime Contractors. The project was completed in March of 1996. TMG provided a comprehensive cost-loaded CPM project scheduling package for the work.
North Carolina Women’s & Children’s Hospital Utility Relocation Project
UNC Hospitals
Chapel Hill, North Carolina
North Carolina Women’s & Children’s Hospital
UNC Hospitals
Chapel Hill, North Carolina
NovoPharm Solid Dosage Facility
NovoPharm
Wilson, North Carolina
Parking Deck PG1R
Duke University Medical Center
Durham, North Carolina
The new 1800 vehicle, 590,000 square foot precast structure parking deck serves the Duke Med. Center-South campus. The project consists of three phases; 1) Renovate/reverse traffic on existing deck PG1, 2) close existing roadways and construct new deck PG1R, and 3) demolition of existing deck PG1. The deck is 7 levels tall, with 2 underground levels. The 18 month project was contracted Single Prime. TMG provided a comprehensive CPM project scheduling package. The project was completed in August of 1995.
Parking Structure / Terminal “A” Improvements
Raleigh-Durham International Airport
Raleigh-Durham, North Carolina
Partner’s Building
North Carolina State University / Centennial Campus
Raleigh, North Carolina
Pediatric Intensive Care Unit / “C” Wing Renovations
Wake Medical Center
Raleigh, North Carolina
Sampson County Phase II Additions & Renovations
Sampson County Memorial Hospital
Clinton, North Carolina
Student Recreation Center
East Carolina University
Greenville, North Carolina
Surgical Suites Renovation
Wake Medical Center
Raleigh, North Carolina
The Thurston-Bowles Buildings
UNC School of Medicine
Chapel Hill, North Carolina
The 160,000 square foot, CIP-structure for alcohol research incorporates classroom, laboratory, meeting and office spaces. TMG provided project closeout control services including remaining work definition, recovery scheduling and project documentation. The multiple Prime construction contract project was completed in October of 1994.
UNC Charlotte Student Activity Center
University of North Carolina at Charlotte
Charlotte, North Carolina
Wake Medical Vertical Expansion Project
Wake Medical Center
Raleigh, North Carolina
The project, consisting of adding a steel-framed sixth floor to the existing A, B, and C wings at Wake Medical Center, added 75,000 feet of space to the hospital. A key portion of the work is the phased shut-down and extension upward of all elevators in the affected wings. Upper-floor patient rooms will be cycled (decommissioned) to allow renovation necessary to the new floor. The 18 month project was awarded single Prime. TMG administered the development and monitoring of a cost-loaded CPM project scheduling package. The project was completed in November of 1995.
|