Projects

Alamance Regional Medical Center

Alamance Regional Health Services

Burlington, North Carolina

TMG provided construction phase project control services for the new 230 bed, 360,000 square foot full-service medical center. Constructed on an 80 acre site near Elon College, NC, the steel frame main building incorporates a cruciform plan with twin 4-story bed towers, a medical mall, ancillary support spaces, and detached Energy building. The fast-track, multiple bid package project was administered by a managing contractor. The project was completed in June of 1995.

 

Avent Ferry Complex Residence Hall Renovations

North Carolina State University

Raleigh, North Carolina

 

Belle Meade Retirement Community

St. Joseph’s of the Pines

Southern Pines, North Carolina

 

Cardiovascular Laboratory Addition

New Hanover Regional Medical Center

Wilmington, North Carolina

 

Clinical Services Building Addition

NorthEast Medical Center

Concord, North Carolina

 

Cypress Glen Retirement Center

United Methodist Retirement Homes

Greenville, North Carolina

 

Deerfield Episcopal Retirement Community

Deerfield Episcopal Retirement Community

Asheville, North Carolina

 

Duke Ambulatory Care Clinics & Engineering Systems Renewal

Duke University Medical Center

Durham, North Carolina

This 4-year multi-phased project consists of 173,000 square feet of new space and 195,000 square feet of renovation work in the Duke Hospital South complex. Phase 1 includes a new 3-level cast-in-place concrete, stone-clad Reception Building on the north side of Duke Hospital South with an air-conditioned pedestrian bridge to the existing PG1R parking garage. A new 4-level cast-in-place infill structure on the south side of Duke Hospital South overlooks the Sarah P. Duke Gardens, as does the new 1-story steel addition atop the East Infill building. Phase 2 consists of a new 3-level cast-in-place concrete, stone-clad Connector Building and significant internal renovations in the Duke Hospital South complex. Phases 3 and 4 complete the renovations in the Duke Hospital South complex. A related project called the Engineering Systems Renewal Project adds (4) new air handlers to serve the new and renovated spaces, 32 new mechanical shafts and electrical risers in Duke Hospital South and mechanical and electrical upgrades in numerous existing mechanical rooms. TMG provided construction phase project control services and personnel relocation planning services on a departmental basis. The project began in October 1996 and was completed on schedule in the fall of 2000.

 

Duke Center for Living Medical Office Building

Duke University Medical Center

Durham, North Carolina

 

Duke South Hospital Renovations

Duke University Medical Center

Durham, North Carolina

 

Existing Facility Fire Alarm & Sprinkler Renovations

UNC Hospitals

Chapel Hill, North Carolina

 

Heart Center 

Wake Medical Center

Raleigh, North Carolina

 

Joyner Library Additions & Renovations

East Carolina University        

Greenville, North Carolina

 

Kenan Flagler School of Business Parking Deck

University of North Carolina

Chapel Hill, North Carolina

 

Martin Marietta Office Building

Martin Marietta

Raleigh, North Carolina

 

Medical Education Institute / Clinic  

Wake Medical Center

Raleigh, North Carolina

 

Medical Office Building (Southwest Satellite Facility)

Duke University Medical Center

Durham, North Carolina

 

Moore Regional Hospital

Moore Regional Hospital

Pinehurst, North Carolina

 

Moses Cone East Wing Addition & Renovations

Moses Cone Memorial Hospital

Greensboro, North Carolina

 

North Carolina Neurosciences Hospital

UNC Hospitals

Chapel Hill, North Carolina

The Milestone Group (TMG) provided CPM scheduling services for the new research hospital. The building is a ten story, 250,000 square foot cast-in-place concrete structure with exterior skin of precast concrete and aluminum curtainwall.  The seventh floor of the hospital is given exclusively to faculty laboratories. The project was contracted to multiple Prime Contractors. The project was completed in March of 1996. TMG provided a comprehensive cost-loaded CPM project scheduling package for the work.

 

North Carolina Women’s & Children’s Hospital Utility Relocation Project

UNC Hospitals

Chapel Hill, North Carolina

 

North Carolina Women’s & Children’s Hospital

UNC Hospitals

Chapel Hill, North Carolina

 

NovoPharm Solid Dosage Facility

NovoPharm

Wilson, North Carolina

 

Parking Deck PG1R

Duke University Medical Center

Durham, North Carolina

The new 1800 vehicle, 590,000 square foot precast structure parking deck serves the Duke Med. Center-South campus. The project consists of three phases; 1) Renovate/reverse traffic on existing deck PG1, 2) close existing roadways and construct new deck PG1R, and 3) demolition of existing deck PG1. The deck is 7 levels tall, with 2 underground levels. The 18 month project was contracted Single Prime. TMG provided a comprehensive CPM project scheduling package. The project was completed in August of 1995.

 

Parking Structure / Terminal “A” Improvements

Raleigh-Durham International Airport

Raleigh-Durham, North Carolina

 

Partner’s Building

North Carolina State University / Centennial Campus

Raleigh, North Carolina

 

Pediatric Intensive Care Unit / “C” Wing Renovations

Wake Medical Center                                    

Raleigh, North Carolina

 

Sampson County Phase II Additions & Renovations

Sampson County Memorial Hospital

Clinton, North Carolina

 

Student Recreation Center

East Carolina University

Greenville, North Carolina

 

Surgical Suites Renovation

Wake Medical Center

Raleigh, North Carolina

 

The Thurston-Bowles Buildings

UNC School of Medicine

Chapel Hill, North Carolina

The 160,000 square foot, CIP-structure for alcohol research incorporates classroom, laboratory, meeting and office spaces. TMG provided project closeout control services including remaining work definition, recovery scheduling and project documentation. The multiple Prime construction contract project was completed in October of 1994.

 

UNC Charlotte Student Activity Center

University of North Carolina at Charlotte

Charlotte, North Carolina

 

Wake Medical Vertical Expansion Project

Wake Medical Center

Raleigh, North Carolina

The project, consisting of adding a steel-framed sixth floor to the existing A, B, and C wings at Wake Medical Center, added 75,000 feet of space to the hospital. A key portion of the work is the phased shut-down and extension upward of all elevators in the affected wings. Upper-floor patient rooms will be cycled (decommissioned) to allow renovation necessary to the new floor. The 18 month project was awarded single Prime. TMG administered the development and monitoring of a cost-loaded CPM project scheduling package. The project was completed in November of 1995.

 